3M™ Adhesive-Backed Nylon Hook and Loop Tape
3M™ Adhesive-Backed Nylon Hook and Loop Tape Thumb 3M™ Adhesive-Backed Nylon Hook and Loop Tape Thumb

3M™ Adhesive-Backed Nylon Hook and Loop Tape

Reference price US$0.05 – 1.20 / m FOB Xiamen · varies with width and order quantity
  • Model No: vc-115

  • Specifications

    Width : 10-150 mm, slit to order (+/-0.5 mm)
    Material : 100% Nylon
    Colour : Natural / made to order
    Minimum order : 500 m (stock colour) / 3,000 m (dyed)
    Sample : 7 days, cut to width
    Production : 2-3 weeks after sample approval
    Certification : SGS / Oeko-Tex / ISO 9001; REACH and RoHS declarations
    Packing : Polybag, export carton, palletised for LCL
    Port : EXW Xiamen, FOB or CIF
    Payment : T/T 30% deposit, balance against copy of B/L
    Slitting tolerance : ±0.5 mm
  • Inquiry now

Detailed description

If the last shipment had edges fraying, a width that measured wide on arrival, or a peel that read low in incoming inspection, the cause is almost always in one of the four items described on this page rather than in the price.

What the buyer is choosing

Grade and backing are separate decisions. The same woven face is supplied plain for stitching, coated with acrylic for panels, or coated with rubber for rough and low-energy surfaces. Buying the face and the backing as one item is what produces the 'it stuck for a week then fell off' complaint.

The material question

The fibre is nylon (polyamide). It takes dye deeply, which is why the colour range is wide and why the colour holds through washing at 40 degrees. Its weakness is moisture regain: a nylon roll absorbs water in transit, measures wide on arrival and settles back over about a week, so allow for it in incoming inspection rather than rejecting the lot.

The adhesive version is coated with acrylic rather than hot melt, which is what keeps the bond from creeping when the panel sits in a warm vehicle or behind glass. Full strength takes twenty-four hours at room temperature.

How it is quoted

Quotations are built from construction, width and colour, in that order. Change any one of the three and the price moves, which is why we ask for all three before quoting instead of sending a range and adjusting afterwards.

What ships with the goods

Colour is checked against the retained standard under D65 on every lot, and weft skew, oil marks and hook damage are inspected across the full roll rather than on a cut sample.

Checking it on arrival

Open one carton from the middle of the pallet, not the top. Condensation and compression both show up in the middle of a stack, and the top carton is the one that was packed with the most care.

If the grade is still open, send the application and the cycle count and we will tell you which of the three constructions is the cheapest one that will survive it.

Send us your question about this product