Detailed description
Three decisions fix the price of this item: the material, the attachment method and the artwork. Change any one and the tooling, the minimum and the lead time all move with it.
Where it is used
Common orders are small runs with several designs on one sheet, mixed sizes for a uniform programme, and repeat orders against artwork held on file. Where artwork is held, the repeat run skips the tooling and drops to piece price.
The material question
The construction is made to artwork, so the material and the attachment method are agreed before tooling rather than described in a catalogue. Send the drawing and the fabric it goes on and the construction follows from those two facts.
How it is quoted
Minimum order is set by the sheet, not by the design: several small designs can share one run, which is how a club with six logos keeps the unit cost close to a single-logo order.
What ships with the goods
Each carton is marked with the design reference, size, quantity and lot, and the artwork reference is repeated on the packing list so a mixed shipment can be checked without opening every carton.
Checking it on arrival
Press one piece onto the actual fabric with your own settings before the run starts. The failure mode on transfers is almost always the press, not the film, and it is cheaper to find that on one piece than on five hundred.
If this is a repeat order, send the previous artwork reference and we will quote against the tooling already on file.